Projects Completed
SASOL II GASIFICATION
Supply, fabricate and install the coal supply materials handling
systems for a Test Gasifier and Load-out station
Date : December 1997 – May 1998
Project Value: R6 Million
Fast Track Brown-fields project, under difficult conditions,
partially in gassy areas. Under class 1 Div.1 Regulations(Zone1).
MALELANE MILL
Bagasse Conveyor and new Bagasse Ploughs
Date: April 1998 – December 1998
Project Value: R1,6 Million
Modification of the existing Bagasse conveyor
And the installation of a new conveyor and
Ploughs to feed the new Boiler 6.
MIDDELBULT MINE
Underground conveyor systems and bins.
Date: February 1999 - October 1999
Project Value: R1,8 Million
Existing bin and conveyors removed Fabrication and installation
of an underground Conveyor system together with a new Incline
Shaft Bottom Bin.
ISCOR VANDERBIJLPARK
Additions and upgrading of the Coke and Sinter Plant Materials Handling System.
Date: February 2000 – August 2000
Project Value: R9.6 Million
Project consisted of 1 pocket conveyor, a Feed Conveyor with Gantries,
a conveyor to the Furnace 5 Bunker Trippers, installation of a new Vibrating Screen.
General modifications and upgrading of the Material flow system.
ISCOR VANDERBIJLPARK
Design, Manufacturing, Supply and Delivery of a new K3 Bunker
Date: September 2000 – February 2001
Project Value: R930 000 Thousand
The K3 Bunker formed part of a battery of Bunkers at Iscor, Vanderbijlpark, fed by train
and loco system on a continuous base. The structural steel at girders was badly corroded.
New Bunker and supporting steelwork were fabricated and erected without interrupting
production. The existing structure was used as a temporary support underneath the existing
operating railway system.
ISCOR VANDERBIJLPARK
IFSP Blast Furnace Stockyard upgrade
Date: May 2001 – June 2002
Project Value: R22 Million
Design, Fabrication and supply of equipment, Installation and Commissioning of Two Stackers,
to stack Coke and Sinter, together with associated conveyors.
SUPRACHEM
Turnkey project, for a storage facility, including Screening and a Load-out facility.
Date: May 2001 – 2003
Project Value: R18 Million
The project consisted of a Conveyor system, a 3200m3 Silo with a truck load-out facility.
Vibrating feeders, Screening facility 3 fractions.6 point loading facility to load trucks,
and a 6 point loading facility to load Railway wagons.
LEEUWPAN COAL MINE
Traveling Stacker and Yard Conveyor
Date: August 2004
Project Value: R7 Million
Turnkey Project involving a 300 t/h Stacker including the supply and tripper.
LEEUWPAN COAL MINE
Stockyard and Reclaiming System
Date: September 2004
Project Value: R19 Million
Turnkey Project involving Stockyard bed preparation, 220m Tunnel, 12 withdrawal points
including chutes, Reclaim Conveyor and Plant Feed Conveyor.
SASOL COAL
Feasibility Study
Date: September 2006
Study for the Upgrade of the Exisiting Material Handling System at Export Plant.
GROOTEGELUK COAL MINE
Materials Handling System
Date: May 2005
Project Value: R92 Million
Turnkey Project
This Project involves a Stockyard bed preparation, Stacker and Reclaimer embankments, including Civil work and rails.
Stacker and Reclaim conveyors, 450t Bin including Feed Conveyor, 3000t Silo including Feed Conveyors.
Upgrade of Apron Feeder and Bradford Breaker. Screen and Feed system.
SISHEN IRON ORE
Taster Plant Conveyors
Date: March 2007
Project Value: R8.5 Million
Turnkey Project
This Project involves the design through to commissioning of a conveyor system and support structures
for a Tester Plant at Sishen South.